1. intro

in same rare cases we must limit the injection of a maximum power into the grid.

in this tutorial we will show how to configure trough the build-in datamanager of an SMA tripower X.

as a prereq we will assume that we installed and configured an energymeter such as an elgris or a sma homemanager

for this scenario we have 2 SMA tripower X15 and want to limit the injection to a max power of 26K (86% active power).

2. step by step

./pic/pic11.png

./pic/pic12.png

./pic/pic13.png

./pic/pic14.png

./pic/continue.png

./pic/pic15.png

./pic/pic16.png

./pic/pic17.png

./pic/continue.png

./pic/continue.png

./pic/save.png